Irrigation pipe fusion


The irrigation pipe is being delivered to the mountain and transported up to Nettles Cove Road. The fusion or connection of the main line has begun on the road behind #9 tee area. The long sections of pipe will be moved and installed on #9 sometime this week. 

Popular posts from this blog

Golf Course Update 3-26-2024