Boring under the runway


Using a directional boring machine to take an 8 inch hdpe pipe underneath the runway. This will allow more water flow and faster run times in the future. No disruption to runway surface as the pipe is installed 3 to 5 feet below surface. 

Popular posts from this blog

Golf Course Update 3-26-2024

Golf Course Update 10-23-2024